Service with Distinction

Stay informed

Subcribe to blog

Client login

Our portal allows clients to access a wide range of management information, including Insurance Certificates, Risk Assessments, KPIs, COSHH, Accreditations, Safe System of Work, Policy documents including Health & Safety, Environmental and Quality Statements, Quality Reports and Meeting Minutes.

TUPE - Glass Half Full

posted 22/10/2013 - 22:41

When the current version of the Transfer of Undertakings (Protection of Employment) Regulations (TUPE) appeared in 2006 it is fair to say it was not greeted with unalloyed joy by the majority of employers affected. The business model of companies that use the contract cleaning industry meant that it was directly affected every time a contract was a... | read more

Case Study: Cleaning in a Pharmaceutical Environment

posted 15/10/2013 - 15:22

A pharmaceutical environment can range from a single laboratory to an international research facility. For Temco Facility Services it means cleaning in a high end manufacturing facility where production of medical diagnostics involving radioactive material must meet the highly exacting standards of drug agencies from around the world. As ... | read more

Case Study: Intelligent Cleaning

posted 08/10/2013 - 15:25

A contract with a cutting edge US IT company provides an outstanding example of how re-engineering the spec can deliver a highly improved service – as well as significant savings. Evening cleaning When Temco took over the contract from two (sometimes overlapping) contractors they inherited a process based on traditional evening cleaning and l... | read more

Case Study: Nurturing Staff Talent

posted 01/10/2013 - 15:26

Temco Facility Services’s intelligent, well trained and highly productive workforce is the result of many years’ commitment to the highest possible standards. This is no better demonstrated than by looking at Roger Lee, who, through TUPE, joined Temco when they won the Kodak contract in 2001. Roger makes no bones about his problems at t... | read more

Smart Quality Management

posted 24/09/2013 - 15:28

Without a comprehensive Quality Management Programme contract decline is a virtual certainty. A QMP will make objective physical checks, but collating and controlling data, then reporting on inspections is a major challenge – but it is essential to assess the agreed statistical quality levels regularly over the life of the contract. For this ... | read more